Skip to main content
#Title
1351Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk F in 2013
1352Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk F in 2012
1353Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk F in 2011
1354Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013
1355Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2012
1356Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2011
1357Letter of confirmation of geophysical surveys made in conjunction between Professor G.E.G. Sargent and the FBA 1983-1987
1358Remote sensing and baseline monitoring of the coastal waters of England and Wales 1992-1993 : a survey report
1359Gorran Haven (Little Perhaver) EC bathing waters directive failure 1996 : an investigation of the Gorran Haven Stream
1360The development of macroinvertebrate keys using TWINSPAN classification : a manual for NRA biologists (001/10/W) : draft final report
1361River Wissey investigations : linking hydrology and ecology : the basis for in-river flow management. Final Draft (OI/526/ )
1362Economic appraisal and assessment of benefits in the PR04 environment programme : findings of an environment agency seminar, January 2003
1363Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1364Developing Quality Assurance for Fish Counter Data - Phase 1: An Assessment of the Salmonid Fish Counter Network in England and Wales
1365The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1366A review of the industrial uses of continuous monitoring systems : incineration processes : a report produced for NCCA and ETSU by Entec
1367Addendum to the Stanmoor bank feasibility study and appraisal report : Lower Tone flood defence improvements : phase II
1368Algal growth in the impounded waters of a proposed barrage at Cardiff Bay : prediction using 1989 data
1369An Assessment of the Feasibility of Using DGT Procedures to Measure Trace Metals and Radionuclides in Rivers
1370An audit of performance in the analysis of biological samples in 2000. Environment Agency : AQC audit : C00158/11
1371An investigation into possible causes of poor water quality at Blakewell Bridge (R30A001) on the Bradiford Water
1372An investigation into possible causes of poor water quality at Nymphayes Bridge (R30D009) on the Gissage Lake
1373An investigation into the best method to combine national and local data to develop site-specific critical loads
1374Analysis of growth and survival of sea trout from the Welsh Dee: Interim Report, 2nd April 2000
1375Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A