Skip to main content
#Title
1251The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1252River Wissey investigations : linking hydrology and ecology : the basis for in-river flow management. Final Draft (OI/526/ )
1253Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1254Possible replacements for the biochemical oxygen demand (BOD) test and suspended solids as measures of effluent and water quality
1255Strategic Land Use Planning In Europe And Usa: Review Of Best Practice For The Environment Agency (Vol 1 Overview And Recommendations)
1256Audit of priority species of rivers and wetlands : Bittern Botaurus stellaris in South Hampshire and the Isle of Wight
1257River Lemon corridor survey : a report prepared by Ecologue for the National Rivers Authority (South West Region)
1258Audit of priority species of rivers and wetlands : white-clawed crayfish Austropotambius pallipes in South Hampshire and the Isle of Wight
1259Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1260Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001)
1261Gorran Haven (Little Perhaver) EC bathing waters directive failure 1996 : an investigation of the Gorran Haven Stream
1262Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1263NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1264Graphical representation of certain metals and organics concentrations versus flow rates for some of the rivers in Districts 3 and 6
1265Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1266A review of the industrial uses of continuous monitoring systems : incineration processes : a report produced for NCCA and ETSU by Entec
1267The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1268Manor Wall and Landguard Fort sea defences, Felixstowe : part of the Southern Felixstowe coastal strategy option selection scoping consultation document
1269Letter of confirmation of geophysical surveys made in conjunction between Professor G.E.G. Sargent and the FBA 1983-1987
1270The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1271Analysis of natural and polluted river communities in Great Britain- Progress report for the period January-December 1987
1272Low flows and water resources : facts on the top 40 low flow rivers in England and Wales
1273Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
1274Sea trout gene banks : the feasibility of developing and utilising gene banks for sea trout (salmo trutta) conservation
1275Micro low flows average and low flow estimation in the SW region : validation of version 1.2 software