26 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
27 | National marine baseline survey 1995 : littoral cell 2 : Flamborough Head to the Wash |
28 | Aldrin and dieldrin concentrations in the Newlyn catchment during 1991 an interim report |
29 | Investigation of tecnazene contamination in the Chyandour Brook west Cornwall during spring 1990 |
30 | Land use practices and pathways of pesticide residues in the Mount's Bay catchment, Cornwall |
31 | Scope for growth and levels of contaminants in mussels from the Wash. Phase 2 |
32 | An assessment of mercury contamination in the Red River catchment : final draft report |
33 | Gorran Haven (Little Perhaver) EC bathing waters directive failure 1996 : an investigation of the Gorran Haven Stream |
34 | Investigation to assess the compliance of Trelavour Kilns discharge CP7 (SW 9479 5722) with consent conditions and to identify any impact upon water quality in the St Dennis Stream : final draft report |