Skip to main content
#Title
1051Analysis of bacteriological contamination and accumulation of metals and organics in the mussel (Mytilus edulis)
1052Desktop study of methods for the monitoring of particulate emissions from positively pressurised baghouses
1053Lower Lee fish mortalities associated with rainfall : including the event of 7/8th September 1993
1054Integrated river corridor assessment : a pilot study of the rivers Wansbeck and North Tyne in Northumbria
1055River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region)
1056Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
1057River Stort : draft catchment management plan for flood defence and the environment : May 1991
1058Catchment management plans : protecting and enhancing the water environment in an integrated manner
1059Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
1060YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2012
1061YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2011
1062YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2013
1063YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2012
1064YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2013
1065Recorded rainfall data from Rain Gauge 6 in the Wensum Catchment between 2010-2015
1066Recorded rainfall data from Rain Gauge 3 in the Wensum Catchment between 2010-2015
1067Recorded rainfall data from Rain Gauge 5 in the Wensum Catchment between 2010-2015
1068Recorded rainfall data from Rain Gauge 1 in the Wensum Catchment between 2010-2015
1069Recorded rainfall data from Rain Gauge 4 in the Wensum Catchment between 2010-2015
1070Recorded rainfall data from Rain Gauge 2 in the Wensum Catchment between 2010-2015
1071YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk A in 2011
1072Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1073A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1074Correspondence Relating to the Seismic Surveys of Lake District Water Bodies undertaken by Prof. Gerald Sargent in 1983 and 1987
1075The Effect of N Fertiliser forms on nitrous oxide emissions from UK arable and grassland. Defra project number NT2605