976 | The Wandle, Beverley Brook, Hogsmill catchment management plan : report on formal consultation response to : response to Wandle/Beverley/Hogsmill CMP catchment management report November 1994 |
977 | Remote surveillance data for assessing landscape change as a result of foot and mouth : a study in the Lake District : final report |
978 | Summary document to assist public consultation on proposals for the future regulation of disposals of radioactive waste from British Nuclear Fuels Ltd, Sellafield |
979 | Environmental assessment guidelines : a procedure for ensuring environmental factors are taken into account in the design and implementation of land drainage improvement works |
980 | Controls on emissions from coal and oil fired power stations : the agency's decision following its 1999 public consultation on its proposed controls |
981 | Water UK and Environment Agency water efficiency awards 2001 : recognising excellence in water conservation and efficiency in industry, business and the public sector |
982 | Creating an environmental vision : summary : progressing the Environment Agency's contribution to sustainable development by way of a better environment in England and Wales. Consultation draft June 2000 |
983 | Environmental radioactivity around steel works : an evaluation of the significance of lead-210 and polonium-210 in environmental samples collected in 1996/97 from around steel works Operated by British Steel at Redcar, Scunthorpe, Llanwern and Port Talbot |