Skip to main content
#Title
1251The protection of East Anglian wetlands Phase 2 : review of BGS draft report. February 1995 (OI 558)
1252The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1253River Wissey investigations : linking hydrology and ecology : the basis for in-river flow management. Final Draft (OI/526/ )
1254Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1255Possible replacements for the biochemical oxygen demand (BOD) test and suspended solids as measures of effluent and water quality
1256Strategic Land Use Planning In Europe And Usa: Review Of Best Practice For The Environment Agency (Vol 1 Overview And Recommendations)
1257Audit of priority species of rivers and wetlands : Bittern Botaurus stellaris in South Hampshire and the Isle of Wight
1258Audit of priority species of rivers and wetlands : white-clawed crayfish Austropotambius pallipes in South Hampshire and the Isle of Wight
1259Audit of priority species of rivers and wetlands : Marsh Fritillary in South Hampshire and the Isle of Wight
1260List of R and D outputs September 1989 to September 1995 : the National Rivers Authority's R and D programme
1261Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1262Micro low flows average and low flows estimation in the SW region : validation of regional version 1.3 software
1263Guidance to agency officers on the provision of technically competent management (multiple sites) at licensed waste facilities
1264Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1265NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1266Scoping Study For Collaborative R and D Between The Environment Agency And L'agence De L'eau Seine Normandie
1267Graphical representation of certain metals and organics concentrations versus flow rates for some of the rivers in Districts 3 and 6
1268Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1269Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2011
1270A review of the industrial uses of continuous monitoring systems : incineration processes : a report produced for NCCA and ETSU by Entec
1271The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1272Eutrophication in controlled waters in the Warwickshire Avon catchment (final report). Vol 1 : report and executive summary
1273Manor Wall and Landguard Fort sea defences, Felixstowe : part of the Southern Felixstowe coastal strategy option selection scoping consultation document
1274Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013
1275Investigating the feasibility of using neural networks to derive chlorophyll a prediction algorithms for case 2 waters