Skip to main content
#Title
201An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
202Options for development of an enhanced team culture in the NRA, using the Welsh Regional Technical Department as an example
203A preliminary investigation into the extent of saline ingress into Curry Moor from the River Tone, January 1994
204Modelling the contribution from non-agricultural sources to nitrate pollution in the Sor Brook (Thames Region) (UC 3134)
205A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake
206Procedure for quality assurance for RIVPACS compatible macro-invertebrate samples analysed to the taxonomic level needed for the BMWP-score system
207The Economics of No-Spray Zones - a Study of the Risks and Benefits of Pesticide No-Spray Restrictions
208An audit of performance in the AQC inspection of standard biological macro-invertebrate samples in 2002 : The Environment Agency (C00158/31)
209An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989
210An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
211River Habitat Quality the physical character of rivers and streams in the UK and Isle of Man
212An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991)
213An investigation into the frequency of discharge of three combined sewer overflows in the Afan/Kenfig catchment : TM/EAW/96/06
214Land use assessment of non-tidal main rivers in the southern region of the National Rivers Authority : report EX 2922
215Dead zones, live markers: the biological environments of larger U.K. Rivers
216The Impact Of Particulate Outputs Associated With Timber Harvesting
217Quality audit of biological samples for the 1991 river quality survey
218The Wandle, Beverley Brook, Hogsmill catchment management plan : consultation report : November 1994
219The River Cam catchment management plan : annual monitoring report
220Statement on public consultation for the Dove CMP : July 1995
221The Warwickshire Avon catchment management plan : final plan : October 1994
222Water from the River Dee : a working partnership
223River quality in England and Wales : a report of the 1990 survey
224Rivers of the Isle of Wight fact file
225The Influence of Variations in Flow on General Quality Assessment of Rivers