76 | Continuous water quality monitoring results for the Carnon river |
77 | Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
|
78 | The identification and investigation of a dinoflagellate bloom in Mounts Bay, Cornwall |
79 | The Test catchment southern : recommendations for statutory water quality objectives |
80 | Dioxins and the River Doe Lea : plain English report |
81 | Fishery survey of the Bridgwater and Taunton Canal |
82 | The quality of rivers and estuaries in Northumbria region 1990 |
83 | Pesticide residues in fish taken from the Newlyn River (1992) |
84 | Doe Lea restoration study : the work of WRc |
85 | Water quality investigations in the Newlyn river catchment |
86 | The Ely Ouse catchment management plan : final plan : January 1994 |
87 | State of the environment report for Thames Region : first update 2001 |
88 | Groundwater flooding in the Thames region : winter 2000/01 |
89 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998 |
90 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
91 | National marine baseline survey 1995 : littoral cell 2 : Flamborough Head to the Wash |
92 | River Wissey investigations : linking hydrology and ecology : summary of a recommendations for the River Wissey (OI/526) |
93 | Investigation of tecnazene contamination in the Chyandour Brook west Cornwall during spring 1990 |
94 | Greatham Creek tidal defences inter regional review : prepared for the purposes of legal proceedings |
95 | An investigation of ecological change in the rivers Kennet and Lambourn. April 2001 - March 2002 |
96 | Partnership in environment protection : taking steps towards a better environment in the midlands |
97 | Discharge monitoring in the Kennet catchment. Part 1 : ecological effects of sewage and trade effluents |
98 | Impact assessment of Helston Sewage Treatment Works on water quality of the River Cober Loe Pool |
99 | Discharge monitoring in the Kennet catchment. Part 2 : ecological effects of fish farm discharges |
100 | An assessment of mercury contamination in the Red River catchment : final draft report |