Skip to main content
#Title
26River water quality in the Midlands 1998
27Phosphate in the cut-off channel
28Impact of the signal crayfish Pacifastacus leniusculus and its associated crayfishery on the River Thame
29Water resources for the future : a summary of the strategy for Thames Region
30Bacterial quality of the bathing waters at Seaton, Cornwall, and of the River Seaton
31Environmental monitoring of the Fal Estuary to support the Fal Swan study : final draft report
32The Effect of Atrazine Exposure on the Timing of Salmon (Salmo salar L.) Smolt Emigration
33A study of the mayfly parasite Spiriopsis adipophila, Arvy and Peters (1972) (=Sprininella adipophila, Arvy and Delage 1966) in Ephemera danica from the River Pang, a tributary of the River Thames
34Preliminary assessment of the ability of Restormel fish counter to enumerate the passage of migratory salmonids on the River Fowey : Cornwall Area Fisheries Science Team
35An investigation of ecological change in the rivers Kennet and Lambourn. Report for the period April 1998-March 1999
36Evaluation of FRONTIERS accumulation forecasts in the NRA Thames and North West regions : final report of the Joint Met
37An investigation of ecological change in the rivers Kennet and Lambourn. Progress report for the period April 1999-March 2000
38An investigation of ecological change in the rivers Kennet and Lambourn. Progress report for the period April 1999-March 2001
39Options for transfer of water from the River Trent and reservoir storage at Great Bradley : technical summary of the feasibility report
40A report on the 1992 strategic stock assessment survey of the upper Eden catchment with particular reference to salmonids
41An investigation of ecological change in the rivers Kennet and Lambourn. Report for the period April 2000 - March 2001
42An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989
43The Adur and Ouse catchment abstraction management strategy : consultation document
44Water quality investigations in the Newlyn river catchment
45Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
46An investigation of sewage on the beach at Porthcothan
47Conservation and development of the River Eden spring salmon population
48Second annual review of the Seaton, Looe and Fowey catchment management plan
49State of the environment report for Thames Region : first update 2001
50The Seaton, Looe and Fowey catchment management plan : action plan