51 | Preliminary assessment of the ability of Restormel fish counter to enumerate the passage of migratory salmonids on the River Fowey : Cornwall Area Fisheries Science Team |
52 | An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989 |
53 | A report on the 1992 strategic stock assessment survey of the upper Eden catchment with particular reference to salmonids |
54 | Evaluation of FRONTIERS accumulation forecasts in the NRA Thames and North West regions : final report of the Joint Met |
55 | Options for transfer of water from the River Trent and reservoir storage at Great Bradley : technical summary of the feasibility report |
56 | A preliminary investigation into the extent of saline ingress into Curry Moor from the River Tone, January 1994 |
57 | Second interim report on the environmental impacts of the drought on Yorkshire's rivers April 1995 to April 1996 |
58 | A report on the River Chew at Chewton Mendip, 6th August 1992 |
59 | The Adur and Ouse catchment abstraction management strategy : consultation document |
60 | Impact of reservoir construction construction on the Bruckland Stream |
61 | Water resources for the future : a strategy for North East Region |
62 | Environmental assessment of selected abandoned minewaters in the North East region |
63 | Eel and elver studies in the Severn : interim report (256/6/ST) |
64 | Reduction in aldrin and dieldrin concentrations in the Newlyn River |
65 | Water quality investigations in the Newlyn river catchment |
66 | The River Cam catchment management plan : annual monitoring report |
67 | An investigation of sewage on the beach at Porthcothan |
68 | Water resources for the future : a strategy for Southern region |
69 | Doe Lea restoration study : the work of WRc |
70 | The Cam catchment : recommendations for statutory water quality objectives |
71 | Making an impact on the ground key achievements in 2002 - Somerset area |
72 | Conservation and development of the River Eden spring salmon population |
73 | Groundwater flooding in the Thames region : winter 2000/01 |
74 | The Ely Ouse catchment management plan : final plan : January 1994 |
75 | Second annual review of the Seaton, Looe and Fowey catchment management plan |