276 | Second annual review of the Upper Bristol Avon catchment management plan |
277 | Second annual review of the Sid/Otter catchment management plan 1999 |
278 | The Worcestershire Stour catchment : recommendations for statutory water quality objectives |
279 | Contribution of small streams to potential fish production in the Conwy catchment |
280 | The ecology and management of riverine trees : interim report |
281 | An investigation to determine the water quality of Churchstanton Stream |
282 | The River Arun catchment management plan : action plan |
283 | The Loddon catchment, Thames : recommendations for statutory water quality objectives |
284 | User notes for the Deben groundwater modelling package |
285 | An investigation of the water quality in three Plymouth catchment streams |
286 | Policy and practice for the protection of groundwater - Thames region appendix |
287 | Local environment focus : issues in and around Derby, Matlock, Buxton, Bakewell, Belper and the Derbyshire Dales Issue 3 : Environment Agency Newsletter for the Derbyshire Derwent Catchment October 2003 |
288 | Time of travel on the River Lee under high and medium flow : appendix b : time of travel on the small River Lee |
289 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
290 | Tamar Lakes project 2001 : initial assessment of nutrient data to identify pollution sources, assess the effect of Tamar Lakes on the downstream water quality and to recommend future monitoring requirements |
291 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
292 | Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997 |
293 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
294 | The mobilization and release of mercury, copper, iron, manganese and selenium from contaminated sediment as a result of dredging : laboratory simulation studies : interim report to the National Rivers Authority Anglian Region |
295 | Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992 |
296 | An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95] |
297 | A macroinvertebrate survey of the Releath stream and associated tributaries within the vicinity of Trevethan Farm : final draft report - Water Quality section, Cornwall area |
298 | Report for Anglian Water, NRA Unit on the inclusion of storm water overflows into the Orwell Estuary model, and its use to predict limits for SWO discharges |
299 | Datchet, Wraysbury, Staines and Chertsey flood study : aquatic biology. Part 2 : a survey of the wetland vegetation and aquatric macroinvertebrates of the Abbey River and Chertsey Bourne |
300 | Spring salmon : a review of factors affecting the abundance and catch of spring salmon from the River Wye and elsewhere, and proposals for stock maintenance and enhancement |