26 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
27 | National marine baseline survey 1995 : littoral cell 7 : Lands End to the Severn Estuary |
28 | Aldrin and dieldrin concentrations in the Newlyn catchment during 1991 an interim report |
29 | A report into the impact of small dam construction at Delford bridge, De Lank river |
30 | Investigation of tecnazene contamination in the Chyandour Brook west Cornwall during spring 1990 |
31 | Impact assessment of Helston Sewage Treatment Works on water quality of the River Cober Loe Pool |
32 | Two year aesthetic survey of beaches in the South West (1990 and 1991) |
33 | An assessment of mercury contamination in the Red River catchment : final draft report |
34 | Low flows and water resources : facts on the top 40 low flow rivers in England and Wales |
35 | Environmental protection draft report - united mines landfill appraisal of the disposal of waste from falmouth docks tip |
36 | Gorran Haven (Little Perhaver) EC bathing waters directive failure 1996 : an investigation of the Gorran Haven Stream |
37 | Investigation to assess the compliance of Trelavour Kilns discharge CP7 (SW 9479 5722) with consent conditions and to identify any impact upon water quality in the St Dennis Stream : final draft report |