26 | A collation of the environmental impact work carried out following the Rosebay oil spill, May 1990 |
27 | Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon |
28 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
29 | Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent |
30 | Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997) |
31 | The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe |
32 | Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001) |
33 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
34 | A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89 |
35 | An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96 |
36 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
37 | An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge |
38 | A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake |
39 | An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley |
40 | Quality audit of biological samples for the 1991 river quality survey |
41 | An investigation into the sewage system and storm overflow at Beer (1997) |
42 | First annual review of the River Exe catchment management plan |
43 | First annual review of the Taw/Torridge estuary catchment management plan (1996) |
44 | Non-compliance with water quality objectives on the Croyde stream (upper catchment) |
45 | Impact of breakwaters on the water quality of Sidmouth beach |
46 | Report on the survey of SBM handlers in Devon |
47 | First annual review of the River Taw catchment management plan (1996) |
48 | An investigation into the incidence of spurting from weeping wall slurry stores |
49 | Environmental planning issues in the North Wessex area |
50 | Impact of reservoir construction construction on the Bruckland Stream |