Skip to main content
#Title
26East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
27Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent
28Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997)
29The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe
30Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001)
31Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
32A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89
33An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96
34An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
35An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
36A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake
37An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
38Quality audit of biological samples for the 1991 river quality survey
39Investigation into the cause of high phenols in Budleigh Brook (1998)
40Non-compliance of the Bidwell Brook with river quality objectives
41An investigation into the sewage system and storm overflow at Beer (1997)
42Second annual review of the Sid/Otter catchment management plan 1999
43Second annual review of the Seaton, Looe and Fowey catchment management plan
44First annual review of the River Exe catchment management plan
45First annual review of the Taw/Torridge estuary catchment management plan (1996)
46Non-compliance with water quality objectives on the Croyde stream (upper catchment)
47Impact of breakwaters on the water quality of Sidmouth beach
48Report on the survey of SBM handlers in Devon
49First annual review of the River Taw catchment management plan (1996)
50An investigation into the incidence of spurting from weeping wall slurry stores