Skip to main content
#Title
26Links : an overview of the work of the Environment Agency in Devon : autumn/winter 2003
27A collation of the environmental impact work carried out following the Rosebay oil spill, May 1990
28East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
29Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent
30An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96
31The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe
32Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001)
33An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
34An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
35An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
36A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake
37A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89
38Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
39Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997)
40Review of fishery regulations on the Rivers Taw and Torridge
41Impact of reservoir construction construction on the Bruckland Stream
42Non-compliance of the Bidwell Brook with river quality objectives
43An investigation into the sewage system and storm overflow at Beer (1997)
44Second annual review of the River Torridge catchment management plan
45An assessment of water quality in the River Yarty catchment
46An investigation into the incidence of spurting from weeping wall slurry stores
47Report on the survey of SBM handlers in Devon
48Second annual review of the Seaton, Looe and Fowey catchment management plan
49Investigation into the cause of high phenols in Budleigh Brook (1998)
50The Seaton, Looe and Fowey catchment management plan : action plan