26 | Investigation of the water quality in the Buckland stream up and downstream of East/West Buckland |
27 | Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent |
28 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
29 | An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96 |
30 | Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001) |
31 | An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley |
32 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
33 | An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge |
34 | Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997) |
35 | A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake |
36 | A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89 |
37 | Review of fishery regulations on the Rivers Taw and Torridge |
38 | An investigation to determine the water quality of Churchstanton Stream |
39 | Impact of reservoir construction construction on the Bruckland Stream |
40 | Impact assessment of acidic and metalliferous pollution in the Fowley Stream |
41 | Non-compliance of the Bidwell Brook with river quality objectives |
42 | An investigation into the sewage system and storm overflow at Beer (1997) |
43 | Second annual review of the River Taw catchment management plan |
44 | Second annual review of the River Torridge catchment management plan |
45 | An assessment of water quality in the River Yarty catchment |
46 | An investigation into the incidence of spurting from weeping wall slurry stores |
47 | Report on the survey of SBM handlers in Devon |
48 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
49 | Investigation into the cause of high phenols in Budleigh Brook (1998) |
50 | Artificial recharge to groundwater in the Otter valley |