Skip to main content
#Title
251An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95]
252Report of the Regional Environment Protection Advisory Committee (REPAC) for Thames Region of the Environment Agency : April 1999 - end of March 2000
253Decision document on the review of authorisations for British Nuclear Fuels plc to dispose of radioactive wastes from the Springfield nuclear site : main document
254River Glen : river channel assessment : annex A a report of the nature, availability and extent of data and information relating to the River Glen and its catchment
255National marine baseline survey 1995 : littoral cell 2 : Flamborough Head to the Wash
256National marine baseline survey 1995 : littoral cell 11 : Great Orme to the Solway Firth
257Investigation into the intermittent failure of Wembury Beach to comply with EC bathing water
258Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
259Report on the By Brook low flow investigations : October 2001 : volume 2 : (figures, maps and appendices)
260Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996
261Annual classification of river water quality 1992 : numbers of samples exceeding the quality standard
262Analysis of bacteriological contamination and accumulation of metals and organics in the mussel (Mytilus edulis)
263A change to your licence and the environment : key facts about Anglian region
264Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
265A report on a baseline survey of the subtidal benthic communities within Portland Harbour (January 1997)
266Shrewsbury flood alleviation scheme : options for the remaining areas of Shrewsbury : scoping report January 2002
267The environmental economy of England's northwest : a driver for economic and social progress : executive summary
268Impact assessment of Helston Sewage Treatment Works on water quality of the River Cober Loe Pool
269An audit of performance in the processing of macro-invertebrate samples in 1992
270The hydrological effects of demand management : project definition stage report : 28th May 1996
271River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region)
272Report on the By Brook low flow investigations : October 2001 : volume 1 : report
273Linking hydrology and ecology : River Wissey : Annex B aquatic macrophytes of the River Wissey
274Impact assessment of Meldon quarry on water quality in the West Okement river
275Environmental protection - the waste management licensing regulations 1994 : amended and consolidated. Version 5