201 | Your guide to the Environment Agency - Thames Region - South East Area |
202 | Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
|
203 | A second stage evaluation of the Grant YSI3815 Water Logger |
204 | An investigation of sewage on the beach at Porthcothan |
205 | The Test catchment southern : recommendations for statutory water quality objectives |
206 | The Worcestershire Stour catchment : recommendations for statutory water quality objectives |
207 | An assessment of river water quality in the River Kenn |
208 | Dioxins and the River Doe Lea : plain English report |
209 | Second annual review of the Lower Bristol Avon catchment management plan |
210 | Second annual review of the Upper Bristol Avon catchment management plan |
211 | The River Avon and its tributaries near Malmesbury : river management studies |
212 | Fishery survey of the Bridgwater and Taunton Canal |
213 | Air dispersion climate from the Castle Cement works at Ribblesdale |
214 | Environmental screening for the Merseyside objective 1 programme : environmental screening guidelines |
215 | Water quality investigations in the Newlyn river catchment |
216 | The River Alt/Crossens fish stock assessment 2001 |
217 | State of the environment report for Thames Region : first update 2001 |
218 | State of the environment report 2001 : West Midlands Region |
219 | Interim review of drought management experience in the North West Region of the National Rivers Authority. lessons learned (29th June 1995 - March 31st 1996) |
220 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
221 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
222 | Technical review of the post-closure safety case for the Drigg low-level radioactive waste disposal site : PCSC development programme review plan and instructions for reviewers : guidance note 1, December 1997 |
223 | Decision document on the review of authorisations for British Nuclear Fuels plc to dispose of radioactive wastes from the Springfield nuclear site : main document |
224 | An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95] |
225 | River Glen : river channel assessment : annex A a report of the nature, availability and extent of data and information relating to the River Glen and its catchment |