Skip to main content
#Title
1Bacteriological survey : The Wash
2The management of the water resources of the Lark groundwater unit
3The importance of sediment release of phosphorus in the restoration of the Norfolk Broads
4Re-building the Anglian coastline
5Conservation in the Anglian region
6The release of ammonium and phosphorus from the sediments of the River Ant and Barton Broad : interim report
7The control of phosphorus in the catchment of the rivers Ant and Bure : interim report for period January - December 1992
8The control of phosphorus in the catchment of the rivers Ant and Bure : 3rd annual report May 1989
9Lake restoration : the role of biomanipulation : a one day seminar held in the Broads 18th March 1993 : organised by the National Rivers Authority and the Broads Authority
10Monitoring the coast for flood defence
11The Ely Ouse Essex water transfer scheme
12Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR)
13The effects of water resources management on the rivers Bure, Wensum and Nar in North Norfolk : Final project report to the National Rivers Authority. July 1994
14Report on the results of a comparison of data from two surveys of the microfauna of the wash carried out in 1991 and 1993
15Factual report on the boreholes and installation of standpipes for the combined investigations in connection with the East Ruston common SSSI Alleviation Scheme
16Recorded data from the Black Bridge weather station (weather station 2) in the Wensum Catchment between 2010-2011
17Recorded data from the Swan Hills weather station (weather station 1) in the Wensum Catchment between 2011-2012
18Recorded data from the Black Bridge weather station (weather station 2) in the Wensum Catchment between 2013-2014
19Recorded data from the Black Bridge weather station (weather station 2) in the Wensum Catchment between 2011-2012
20Recorded data from the Swan Hills weather station (weather station 1) in the Wensum Catchment between 2012-2013
21Recorded data from the Black Bridge weather station (weather station 2) in the Wensum Catchment between 2012-2013
22A desk study of the available information on wintering waterfowl feeding in the Wash, Lincolnshire and Norfolk
23Recorded data from the Swan Hills weather station (weather station 1) in the Wensum Catchment between 2013-2014
24Recorded data from the Swan Hills weather station (weather station 1) in the Wensum Catchment between 2010-2011
25Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993