101 | Environmental screening for the Merseyside objective 1 programme : environmental screening guidelines |
102 | Environmental protection and pollution control : in the North West |
103 | The Menai Strait Catchment Managment Plan Action Plan; 1995 (Bilingual) |
104 | Historic changes in the Upper River Ehen Catchment- Summary |
105 | Second annual review of the River Torridge catchment management plan |
106 | A second stage evaluation of the Grant YSI3815 Water Logger |
107 | Reduction in aldrin and dieldrin concentrations in the Newlyn River |
108 | Second annual review of the River Taw catchment management plan |
109 | The Tame catchment management plan : consultation report summary : January 1996 |
110 | An investigation to determine the water quality of Churchstanton Stream |
111 | Macroinvertebrates of the River Nar : Great Ouse catchment : draft report |
112 | The River Alt/Crossens fish stock assessment 2001 |
113 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998 |
114 | Technical review of the post-closure safety case for the Drigg low-level radioactive waste disposal site : PCSC development programme review plan and instructions for reviewers : guidance note 1, December 1997 |
115 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
116 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
117 | Decision document on the review of authorisations for British Nuclear Fuels plc to dispose of radioactive wastes from the Springfield nuclear site : main document |
118 | Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997 |
119 | Interim review of drought management experience in the North West Region of the National Rivers Authority. lessons learned (29th June 1995 - March 31st 1996) |
120 | An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95] |
121 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
122 | Alleviation of low flow studies : the River Avon and its tributaries near Malmesbury : towards a solution |
123 | A study to investigate and propose remedies for river quality problems in the Madford catchment |
124 | National marine baseline survey 1995 : littoral cell 11 : Great Orme to the Solway Firth |
125 | National marine baseline survey 1995 : littoral cell 4 : the Thames to Selsey Bill |