Skip to main content
#Title
26Salmon and sea trout fishing in the estuary of the River Tavy : a review
27The Ribble fisheries management plan : a consultation document produced by the National Rivers Authority
28Investigation of the impact on water quality of the SWW Teign estuary sewerage trenching activity
291994 annual report on fisheries in the North West incorporating the annual summary of fishery statistics
30A review of the use of multifunction wardens in the Devon Area of the South Western Region of the National Rivers Authority, with particular reference to their use within the fisheries function
31Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent
32A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89
33An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96
34An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
35A preliminary investigation into the extent of saline ingress into Curry Moor from the River Tone, January 1994
36An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989
37An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991)
38Quality audit of biological samples for the 1991 river quality survey
39Lakes, Ponds and Reservoirs in the Southern Region (NRA)
40Identification of water quality problems in the Strat and Neet catchments
41Second annual review of the Sid/Otter catchment management plan 1999
42Second annual review of the Seaton, Looe and Fowey catchment management plan
43The Yarrow catchment : recommendations for statutory water quality objectives
44The Adur and Ouse catchment abstraction management strategy : consultation document
45Environmental planning issues in the North Wessex area
46Macroinvertebrates of the River Nar : Great Ouse catchment : draft report
47Reduction in aldrin and dieldrin concentrations in the Newlyn River
48First annual review of the River Tone catchment management plan
49Quality audit of biological samples for the 1990 river quality survey
50The Tame catchment management plan : consultation report summary : January 1996