Skip to main content
#Title
76Charging for discharges scheme : guidance to the agricultural industry
77Policy and practice for the protection of groundwater : Thames Region appendix
78Wash zone report. Part 1 : the Wash NRA monitoring review
79The Identification of Oestrogenic Effects in Wild Fish - Phase II
80Guidance on the use of Bioassays in Ecological Risk Assessment
81Macroinvertebrates in the Kennet catchment : Part 1 - water quality monitoring
82River quality in England and Wales : a report of the 1990 survey
83An ecological study of the effects of ferric dosing on the plankton and benthic invertebrates of Grafham Water between May 1990 and November 1991
84Changes in the phosphorus content of the sediment of Esthwaite Water and water quality in response to a decreasing input of sewage-borne phosphorus
85Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992
86A study of the use of Glycol-based de-icers at RAF Lyneham and their impact on local watercourses during the winter of 1999/2000
87Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997
88A Proposed Scheme To Ensure The Quality Of Data Generated By Laboratories Undertaking Regulatory Ecotoxicological Testing
89The Use of Catch Statistics to Monitor Fishery Change - Coarse Fish Study - Synopsis
90Regional river quality monitoring and surveillance : results of the 1990/1991 biological survey : draft report
91Development of the Acid Water Indicator Community (AWIC) Macroinvertebrate Family and Species Level
92A review of the industrial uses of continuous monitoring systems : minerals industry processes
93An investigation into the water quality of a treated effluent from Hambleton Dairy, Todber, Dorset
94Assessment of radioactive discharge screening levels for biota protected under the habitats regulations : April 2002
95NRA programme for the monitoring of water quality Parts 1 to 3 - November 1994
96Investigation into the intermittent failure of Wembury Beach to comply with EC bathing water
97A review of the industrial uses of continuous monitoring systems : metals industry processes
98Technical basis for the predicted impacts of relocating Redgrave abstraction to Borehole B
99Evaluating the impact of groundwater abstraction on key conservation sites. Stage 1 reports for AMP3
100Bathing water quality in England and Wales in 1994 : report of the National Rivers Authority