Skip to main content
#Title
76The development of biomanipulation techniques and control of phosphorus release from sediments (475/1/A) : LIFE project : restoration of the Norfolk Broads
77An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
78Assessment of the feasibility of using image analysis in the oyster embryo-larval development and daphnia magna growth tests
79A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake
80Water quality objectives: procedures used by the NRA for the purpose of surface waters river ecosystem) (classification) regulations 1994
81Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
82An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991)
83Procedure for quality assurance for RIVPACS compatible macro-invertebrate samples analysed to the taxonomic level needed for the BMWP-score system
84Guidance notes for local planning authorities on the methods of protecting the water environment through development plans
85An audit of performance in the AQC inspection of standard biological macro-invertebrate samples in 2002 : The Environment Agency (C00158/31)
86Interim report on the environmental impacts of the drought on Yorkshire rivers April 1995 to April 1996
87The River Eden Demonstration Test Catchment (DTC) Data
88Environmental snapshot for the East of England [version 1]
89Algal blooms in the Lower Tees- Perspectives and prospects
90Anthropogenic Impacts on the Hydrology of Rivers and Lochs
91Environmental snapshot for the East of England [2000]
92River quality in England and Wales : a report of the 1990 survey
93Environmental assessment of selected abandoned minewaters in the North East region
94Disturbing the season's due: plankton periodicity in Grassmere, 1987
95Non-compliance of the Bidwell Brook with river quality objectives
96River Axe Fish Study - Evaluation of Fish Movements in the Estuary
97First annual review of the Taw/Torridge estuary catchment management plan (1996)
98Water quality investigations in the Newlyn river catchment
99Stream survey and assessment in the Ashford and Folkestone areas
100Water quality 2000 : a strategy for the water quality function