Skip to main content
#Title
1The water quality of the Humber Estuary 1992 : a report from The Humber Estuary Committee
2Study into the effect of Chertsey STW on the North Arm of the River Bourne
3The distribution of nutrients and phytoplankton in the North-East Irish Sea
4Assessment of the impact of discharges from Meldon Quarry on the water quality of the West Okement River
5Investigation to determine if the soakaway from the Stowford Farm caravan site is having an impact on the biological community of the Colam stream
6An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96
7An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
8Algal blooms in the Lower Tees- Perspectives and prospects
9Identification of water quality problems in the Strat and Neet catchments
10The Yarrow catchment : recommendations for statutory water quality objectives
11Non-compliance with water quality objectives on the Croyde stream (upper catchment)
12Macroinvertebrates of the River Nar : Great Ouse catchment : draft report
13The Ribble Estuary 1992 surveys : summary of results
14The Hartland Streams catchment management plan : action plan
15The Mersey Estuary 1992 surveys : summary of results
16A survey of trace metals in biota of the Mersey estuary 1993
17The quality of rivers and estuaries in Northumbria region 1990
18Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989
19A macroinvertebrate survey of the Releath stream and associated tributaries within the vicinity of Trevethan Farm : final draft report - Water Quality section, Cornwall area
20National marine baseline survey 1995 : littoral cell 2 : Flamborough Head to the Wash
21National marine baseline survey 1995 : littoral cell 11 : Great Orme to the Solway Firth
22Investigation into the frequency of storm overflow operation at Bradworthy sewage treatment works (1996)
23An assessment of mercury contamination in the Red River catchment : final draft report
24Report on two electrofishing surveys carried out between July 10-25 1978 and July 9-12 1979 on the proposed Kielder Water
25Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001)