Skip to main content
#Title
51YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2014
52Monitored flow rate at Burracott, Neet catchment
53Monitored river turbidity at Burracott, Neet catchment
54YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2014
55YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2014
56Rivers Axe and Lim catchment management plan : action plan (1997)
57YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2012
58Monitored water temperature, Caudworthy water at Caudworthy Ford, Tamar catchment
59Wheal Jane Minewater Project consultancy studies 1996-1999 : appraisal and selection of long term treatment option, version 5
60Louth coastal action plan 1998
61North Devon streams : first annual review, October 1998
62An investigation of ecological change in the rivers Kennet and Lambourn. Report for the period April 1998-March 1999
63Avon and Erme : second annual review
64Burton, Nuneaton and Tamworth LEAP consultation draft
65Derwent and Cumbria coast catchment management plan : action plan : September 1995
66Freshwater Tamar catchment management plan : first annual review : April 1996 to March 1997
67River Stour (2), Sudbury : report of a river corridor survey carried out for the National Rivers Authority, Anglian region
68The release of ammonium and phosphorus from the sediments of the River Ant and Barton Broad : interim report
69An investigation into bathing water quality at Millendreath
70Alleviation of low flow studies : the River Avon and its tributaries near Malmesbury : towards a solution
71Adur and Ouse LEAP : consultation draft summary : April 1999
72The River Test. 1991.
73Monitored water temperature and dissolved oxygen concentration, Sem at Priors Farm site, Hampshire Avon catchment
74Avon and Erme : third annual review
75Hampshire Avon DTC Diatom Monitoring Data 2011-2013