Skip to main content
#Title
876The evaluation of a YSI model 58 hand-held dissolved oxygen meter (220/24/T)
877The evaluation of an ABB Kent-Taylor model 7135 hand-held dissolved oxygen meter (220/30/T)
878An evaluation of discharge and consent compliance policy : a blueprint for the future
879An evaluation of discharge and consent compliance policy : a blueprint for the future : letters from respondents
880Definition of terms used in the assessment information management system (AIMS) : guidance note 5
881The Natural (Baseline) Quality of Groundwaters in England and Wales - Magnesium Limestone of Yorkshire and Northumbria
882Analysis of bacteriological contamination and accumulation of metals and organics in the mussel (Mytilus edulis)
883Desktop study of methods for the monitoring of particulate emissions from positively pressurised baghouses
884Water pollution incidents in England and Wales - 1993 : report of the National Rivers Authority
885Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
886YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2012
887YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2011
888YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2013
889YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2012
890YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2013
891Recorded rainfall data from Rain Gauge 6 in the Wensum Catchment between 2010-2015
892Recorded rainfall data from Rain Gauge 3 in the Wensum Catchment between 2010-2015
893Recorded rainfall data from Rain Gauge 5 in the Wensum Catchment between 2010-2015
894Recorded rainfall data from Rain Gauge 1 in the Wensum Catchment between 2010-2015
895Recorded rainfall data from Rain Gauge 4 in the Wensum Catchment between 2010-2015
896Recorded rainfall data from Rain Gauge 2 in the Wensum Catchment between 2010-2015
897YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk A in 2011
898Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
899A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
900Correspondence Relating to the Seismic Surveys of Lake District Water Bodies undertaken by Prof. Gerald Sargent in 1983 and 1987