901 | A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC |
902 | Correspondence Relating to the Seismic Surveys of Lake District Water Bodies undertaken by Prof. Gerald Sargent in 1983 and 1987 |
903 | The Effect of N Fertiliser forms on nitrous oxide emissions from UK arable and grassland. Defra project number NT2605 |
904 | The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Norfolk, 2004 |
905 | The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Dumfries, 2004 |
906 | The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Devon, 2004 |
907 | Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales |
908 | Analysis of natural and polluted river communities in Great Britain- Progress report for the period April 1984- March 1988
|
909 | Effects of flow regime on the young stages of salmonid fishes- summary and conclusions based on results for 1981- 1985 |
910 | Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings |
911 | Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A |
912 | The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands |
913 | Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment |
914 | Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology |
915 | Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992 |
916 | NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment |
917 | The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon |
918 | Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D |
919 | NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging |
920 | Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government |
921 | Database and atlas of aquatic vascular plants in the British Isles : part 2 : distribution maps (352/2/N and Y) |
922 | Proposed decision for the future regulation of disposals of radioactive waste from British Nuclear fuels plc Sellafield : supporting information |
923 | Evaluating the impact of groundwater abstraction on key conservation sites, final report : Yare Broads and marshes (Strumpshaw Fen) |
924 | Development of data and information sources on Natura 2000 estuarine sites in the north west : Morecambe Bay : final report |
925 | An overview of the IBP compound when building was finished (generator located in disused house in front). |