976 | Effectiveness of eutrophication control by phosphorus reduction: development of the INCA-P model |
977 | The evaluation of a pHOX model 962 hand-held dissolved oxygen meter (220/28/T) |
978 | The evaluation of a WTW model OXI 196 hand-held dissolved oxygen meter (220/29/T) |
979 | The evaluation of a YSI model 58 hand-held dissolved oxygen meter (220/24/T) |
980 | The evaluation of an ABB Kent-Taylor model 7135 hand-held dissolved oxygen meter (220/30/T) |
981 | An evaluation of discharge and consent compliance policy : a blueprint for the future |
982 | An evaluation of discharge and consent compliance policy : a blueprint for the future : letters from respondents |
983 | Definition of terms used in the assessment information management system (AIMS) : guidance note 5 |
984 | Monitoring the effects of a combined sewer overflow discharge to a small watercourse in South Wales |
985 | Time of travel study on the River Wandle under two different flow conditions |
986 | The Natural (Baseline) Quality of Groundwaters in England and Wales - Magnesium Limestone of Yorkshire and Northumbria |
987 | Biological river quality 1995 according to the general quality (GQA) scheme [map] : scale 1 : 750 000 |
988 | Desktop study of methods for the monitoring of particulate emissions from positively pressurised baghouses |
989 | Lower Lee fish mortalities associated with rainfall : including the event of 7/8th September 1993 |
990 | Integrated river corridor assessment : a pilot study of the rivers Wansbeck and North Tyne in Northumbria |
991 | Water pollution incidents in England and Wales - 1993 : report of the National Rivers Authority |
992 | River Stort : draft catchment management plan for flood defence and the environment : May 1991 |
993 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2012 |
994 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2011 |
995 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2013 |
996 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2012 |
997 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2013 |
998 | Recorded rainfall data from Rain Gauge 6 in the Wensum Catchment between 2010-2015 |
999 | Recorded rainfall data from Rain Gauge 3 in the Wensum Catchment between 2010-2015 |
1000 | Recorded rainfall data from Rain Gauge 5 in the Wensum Catchment between 2010-2015 |