Skip to main content
#Title
1101Recorded rainfall data from Rain Gauge 2 in the Wensum Catchment between 2010-2015
1102YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk A in 2011
1103Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1104A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1105The Effect of N Fertiliser forms on nitrous oxide emissions from UK arable and grassland. Defra project number NT2605
1106The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Dumfries, 2004
1107Analysis of natural and polluted river communities in Great Britain- Progress report for the period April 1984- March 1988
1108Effects of flow regime on the young stages of salmonid fishes- summary and conclusions based on results for 1981- 1985
1109Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk F in 2013
1110An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall
1111Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1112Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
1113Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1114Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2014
1115Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2012
1116The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1117Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1118Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1119Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1120NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1121Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1122The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1123Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013
1124Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
1125Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D