Skip to main content
#Title
1176Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales
1177Analysis of natural and polluted river communities in Great Britain- Progress report for the period April 1984- March 1988
1178Effects of flow regime on the young stages of salmonid fishes- summary and conclusions based on results for 1981- 1985
1179Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk F in 2013
1180Chemical river quality 1993-1995 according to the general quality assessment (GQA) scheme [map] : scale 1 : 750 000
1181An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall
1182Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1183The Menai Strait catchment management plan : action plan (bilingual) : Cynllun Rheoli Dalgylch Afon Menai; 1995 Cynllun Gweithredu
1184Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
1185Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1186Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2014
1187Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2012
1188Quality of Bathing Waters in Hampshire, Sussex, Kent and the Isle of Wight : 1993 Bathing Season : NRA Report DL/bw4/94
1189Micro low flows average and low flows estimation in the SW region : validation of regional version 1.1 software
1190The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1191Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1192Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1193Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1194NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1195Scoping Study For Collaborative R and D Between The Environment Agency And L'agence De L'eau Seine Normandie
1196Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1197Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2011
1198The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1199Manor Wall and Landguard Fort sea defences, Felixstowe : part of the Southern Felixstowe coastal strategy option selection scoping consultation document
1200Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013