Skip to main content
#Title
501An environmental assessment of mercury in mussels (Mytilus edulis L.) in the Mersey Estuary : final report
502Heavy metal contaminants in fish caught from the Mersey Estuary and inshore Liverpool Bay
503Herbicides for use in or near the aquatic environment: Priorities for Environmental Quality Standards Development
504Pesticides 2000 : a summary of monitoring of the aquatic environment in England and Wales
505Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996
506Monitoring the effects of a combined sewer overflow discharge to a small watercourse in South Wales
507The Natural (Baseline) Quality of Groundwaters in England and Wales - Magnesium Limestone of Yorkshire and Northumbria
508Biological river quality 1995 according to the general quality (GQA) scheme [map] : scale 1 : 750 000
509Analysis of bacteriological contamination and accumulation of metals and organics in the mussel (Mytilus edulis)
510Water pollution incidents in England and Wales - 1993 : report of the National Rivers Authority
511Catchment management plans : protecting and enhancing the water environment in an integrated manner
512Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
513A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
514Analysis of natural and polluted river communities in Great Britain- Progress report for the period April 1984- March 1988
515An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall
516Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
517Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
518The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
519NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
520Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
521The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
522The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
523Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D
524Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government
525Evaluating the impact of groundwater abstraction on key conservation sites, final report : Yare Broads and marshes (Strumpshaw Fen)