1226 | The Menai Strait catchment management plan : action plan (bilingual) : Cynllun Rheoli Dalgylch Afon Menai; 1995 Cynllun Gweithredu |
1227 | Addendum to the Stanmoor bank feasibility study and appraisal report : Lower Tone flood defence improvements : phase II |
1228 | Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus |
1229 | Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A |
1230 | East Devon public water supply strategy : the existence and potential use in yield analysis of historic flow records |
1231 | An investigation into possible causes of poor water quality at Nymphayes Bridge (R30D009) on the Gissage Lake |
1232 | Micro low flows average and low flows estimation in the SW region : validation of regional version 1.1 software |
1233 | The protection of East Anglian wetlands Phase 2 : review of BGS draft report. February 1995 (OI 558) |
1234 | The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands |
1235 | River Wissey investigations : linking hydrology and ecology : the basis for in-river flow management. Final Draft (OI/526/ ) |
1236 | Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment |
1237 | Possible replacements for the biochemical oxygen demand (BOD) test and suspended solids as measures of effluent and water quality |
1238 | Strategic Land Use Planning In Europe And Usa: Review Of Best Practice For The Environment Agency (Vol 1 Overview And Recommendations) |
1239 | River Lemon corridor survey : a report prepared by Ecologue for the National Rivers Authority (South West Region) |
1240 | Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001) |
1241 | Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992 |
1242 | NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment |
1243 | Scoping Study For Collaborative R and D Between The Environment Agency And L'agence De L'eau Seine Normandie |
1244 | Graphical representation of certain metals and organics concentrations versus flow rates for some of the rivers in Districts 3 and 6 |
1245 | Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality |
1246 | A review of the industrial uses of continuous monitoring systems : incineration processes : a report produced for NCCA and ETSU by Entec |
1247 | The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
|
1248 | Eutrophication in controlled waters in the Warwickshire Avon catchment (final report). Vol 1 : report and executive summary |
1249 | Manor Wall and Landguard Fort sea defences, Felixstowe : part of the Southern Felixstowe coastal strategy option selection scoping consultation document |
1250 | Investigating the feasibility of using neural networks to derive chlorophyll a prediction algorithms for case 2 waters |