1101 | River Stort : draft catchment management plan for flood defence and the environment : May 1991 |
1102 | Catchment management plans : protecting and enhancing the water environment in an integrated manner |
1103 | Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd |
1104 | A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC |
1105 | Correspondence Relating to the Seismic Surveys of Lake District Water Bodies undertaken by Prof. Gerald Sargent in 1983 and 1987 |
1106 | The Effect of N Fertiliser forms on nitrous oxide emissions from UK arable and grassland. Defra project number NT2605 |
1107 | The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Dumfries, 2004 |
1108 | The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Devon, 2004 |
1109 | Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales |
1110 | Analysis of natural and polluted river communities in Great Britain- Progress report for the period April 1984- March 1988
|
1111 | Effects of flow regime on the young stages of salmonid fishes- summary and conclusions based on results for 1981- 1985 |
1112 | An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall |
1113 | Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings |
1114 | Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus |
1115 | Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A |
1116 | The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands |
1117 | Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment |
1118 | Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology |
1119 | Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992 |
1120 | NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment |
1121 | Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality |
1122 | The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
|
1123 | The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon |
1124 | Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990 |
1125 | Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D |