Skip to main content
#Title
451Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997
452Interim review of drought management experience in the North West Region of the National Rivers Authority. lessons learned (29th June 1995 - March 31st 1996)
453Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992
454Changes in the phosphorus content of the sediment of Esthwaite Water and water quality in response to a decreasing input of sewage-borne phosphorus
455An ecological study of the effects of ferric dosing on the plankton and benthic invertebrates of Grafham Water between May 1990 and November 1991
456Water company plans to safeguard 1997 summer water supplies : Environment Agency report to the Secretary of State for the Environment : fifth report in a series
457Water Quality and Freshwater Flow in the Thames Tideway in Relation to Salmon Migration, with particular reference to the effects of low flow in 1990
458Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary
459The quality of rivers and canals in England and Wales (1990 to 1992) : as assessed by a new general quality assessment scheme : report of the National Rivers Authority
460Tamar Lakes project 2001 : initial assessment of nutrient data to identify pollution sources, assess the effect of Tamar Lakes on the downstream water quality and to recommend future monitoring requirements
461A study of the use of Glycol-based de-icers at RAF Lyneham and their impact on local watercourses during the winter of 1999/2000
462Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989
463Report for Anglian Water, plc on the use of the Orwell Estuary mathematical model to derive long term consent limits for Cliff Quay STW
464Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998
465Review of water company plans to safeguard summer water supplies : Environment Agency report to the Secretary of State for the Environment. Fourth report
466Results of the oyster (Crassostrea gigas) embryo-larval biassay on samples taken during the winter phase of national maritime monitoring programme 1997 : interim report
467Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998
468An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95]
469A macroinvertebrate survey of the Releath stream and associated tributaries within the vicinity of Trevethan Farm : final draft report - Water Quality section, Cornwall area
470An audit of performance in the primary analysis of standard biological macro-invertebrate samples in 2002 : The Environment Agency (CEH Report Ref: C00158/31)
471The Management of blue-green algal blooms in South-East Australia : a report on the visit to Australia by MJ Pearson and AJD Ferguson in January/February 1993
472YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2013
473YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2014
474YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2014
475YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2014