Skip to main content
#Title
1126East Devon public water supply strategy : preliminary assessment of the yield of Clatworthy reservoir
1127River corridor strategic overview feasibility study : a report to the National Rivers Authority
1128Regional river quality monitoring and surveillance : results of the 1990/1991 biological survey : draft report
1129Impact assessment of Meldon quarry on water quality in the West Okement river
1130R and D Strategy to Support Implementation of the Water Framework Directive - Preliminary Scoping Report
1131Biological report of the 1991 coastal and estuarine survey from Crosby to Glasson
1132Electron Microscope Image: Filament of Oscillatoria being ingested by the ciliate Nassula tumida
1133The government's policy for a public regulatory body in a privatised water industry
1134The evaluation of a LTH BOM 1 hand-held dissolved oxygen meter (220/25/T)
1135Less sensitive areas and candidate high natural dispersion areas in the North West region
1136Water pollution incidents in England and Wales - 1990 : report of the National Rivers Authority
1137Interpretation Of Optimisation In The Context Of A Disposal Facility For Long-Lived Radioactive Waste
1138Two year aesthetic survey of beaches in the South West (1990 and 1991)
1139The Impact of Pesticides on River Ecology: Phase 2: A study of headwater streams
1140The Influence of Variations in Flow on General Quality Assessment of Rivers - Summary Document
1141An Investigation of the Equivalent Resistance, Power Requirements and Field Characteristics of Electric Fishing Electrodes
1142Annual classification of river water quality 1992 : numbers of samples exceeding the quality standard
1143The Chemistry of Blended Cements and Backfills Intended for use in Radioactive Waste Disposal
1144The consideration of social issues in environmental impact assessments of Agency flood defence schemes
1145Darwell Transfer Scheme. Final Report Part III. Water quality in the Darwell Reservoir
1146Water pollution incidents in England and Wales 1991 : report of the National Rivers Authority
1147The Impact Of Grazing And Upland Management On Erosion And Runoff: Additional Information
1148Extending Rutland yield analysis to 1933 : supporting documentation for the regional water resources strategy
1149A report into the impact of small dam construction at Delford bridge, De Lank river
1150Investigation into the intermittent failure of Wembury Beach to comply with EC bathing water