176 | A survey of trace metals in biota of the Mersey estuary 1993 |
177 | Wyre estuary shoreline management plan : the Environment Agency's contribution to sustainable development |
178 | Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
|
179 | The identification and investigation of a dinoflagellate bloom in Mounts Bay, Cornwall |
180 | The Worcestershire Stour catchment : recommendations for statutory water quality objectives |
181 | Dioxins and the River Doe Lea : plain English report |
182 | The River Avon and its tributaries near Malmesbury : river management studies |
183 | Eel and elver studies in the Severn : interim report (256/6/ST) |
184 | Estuarial migration of Atlantic salmon in the river Dee (North Wales) |
185 | Pesticide residues in fish taken from the Newlyn River (1992) |
186 | Doe Lea restoration study : the work of WRc |
187 | Investigation of salinity in the river Thurne catchment of North East Norfolk |
188 | The River Alt/Crossens fish stock assessment 2001 |
189 | An assessment of water quality in the River Yarty catchment |
190 | Conservation and recreation : the Wye challenge : volume 2 : technical appendices |
191 | Artificial recharge to groundwater in the Otter valley |
192 | The Ely Ouse catchment management plan : final plan : January 1994 |
193 | Groundwater flooding in the Thames region : winter 2000/01 |
194 | Spring salmon : a review of factors affecting the abundance and catch of spring salmon from the River Wye and elsewhere, and proposals for stock maintenance and enhancement |
195 | Water Quality and Freshwater Flow in the Thames Tideway in Relation to Salmon Migration, with particular reference to the effects of low flow in 1990 |
196 | Tamar Lakes project 2001 : initial assessment of nutrient data to identify pollution sources, assess the effect of Tamar Lakes on the downstream water quality and to recommend future monitoring requirements |
197 | Local environment focus : issues in and around Derby, Matlock, Buxton, Bakewell, Belper and the Derbyshire Dales Issue 3 : Environment Agency Newsletter for the Derbyshire Derwent Catchment October 2003 |
198 | Time of travel on the River Lee under high and medium flow : appendix b : time of travel on the small River Lee |
199 | The mobilization and release of mercury, copper, iron, manganese and selenium from contaminated sediment as a result of dredging : laboratory simulation studies : interim report to the National Rivers Authority Anglian Region |
200 | Report for Anglian Water, plc on the use of the Orwell Estuary mathematical model to derive long term consent limits for Cliff Quay STW |