Skip to main content
#Title
176A survey of trace metals in biota of the Mersey estuary 1993
177Wyre estuary shoreline management plan : the Environment Agency's contribution to sustainable development
178Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
179The identification and investigation of a dinoflagellate bloom in Mounts Bay, Cornwall
180The Worcestershire Stour catchment : recommendations for statutory water quality objectives
181Dioxins and the River Doe Lea : plain English report
182The River Avon and its tributaries near Malmesbury : river management studies
183Eel and elver studies in the Severn : interim report (256/6/ST)
184Estuarial migration of Atlantic salmon in the river Dee (North Wales)
185Pesticide residues in fish taken from the Newlyn River (1992)
186Doe Lea restoration study : the work of WRc
187Investigation of salinity in the river Thurne catchment of North East Norfolk
188The River Alt/Crossens fish stock assessment 2001
189An assessment of water quality in the River Yarty catchment
190Conservation and recreation : the Wye challenge : volume 2 : technical appendices
191Artificial recharge to groundwater in the Otter valley
192The Ely Ouse catchment management plan : final plan : January 1994
193Groundwater flooding in the Thames region : winter 2000/01
194Spring salmon : a review of factors affecting the abundance and catch of spring salmon from the River Wye and elsewhere, and proposals for stock maintenance and enhancement
195Water Quality and Freshwater Flow in the Thames Tideway in Relation to Salmon Migration, with particular reference to the effects of low flow in 1990
196Tamar Lakes project 2001 : initial assessment of nutrient data to identify pollution sources, assess the effect of Tamar Lakes on the downstream water quality and to recommend future monitoring requirements
197Local environment focus : issues in and around Derby, Matlock, Buxton, Bakewell, Belper and the Derbyshire Dales Issue 3 : Environment Agency Newsletter for the Derbyshire Derwent Catchment October 2003
198Time of travel on the River Lee under high and medium flow : appendix b : time of travel on the small River Lee
199The mobilization and release of mercury, copper, iron, manganese and selenium from contaminated sediment as a result of dredging : laboratory simulation studies : interim report to the National Rivers Authority Anglian Region
200Report for Anglian Water, plc on the use of the Orwell Estuary mathematical model to derive long term consent limits for Cliff Quay STW