1 | Study into the effect of Chertsey STW on the North Arm of the River Bourne |
2 | Water Quality of the Humber Estuary 1986 |
3 | Report for Anglian Water, NRA Unit on the uses of the Orwell and the Stour Estuaries and the use of the mathematical model to derive long term consent limits for all inputs to Orwell Estuary |
4 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
5 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
6 | An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991) |
7 | River quality in England and Wales : a report of the 1990 survey |
8 | Catches of migratory fish in the River Don, Aberdeenshire |
9 | Catches of Brown Trout in the River Don |
10 | Environmental assessment of selected abandoned minewaters in the North East region |
11 | Continuous water quality monitoring results for the Upper Tamar |
12 | A study of the use of Glycol-based de-icers at RAF Lyneham and their impact on local watercourses during the winter of 1999/2000 |
13 | Report for Anglian Water, plc on the use of the Orwell Estuary mathematical model to derive long term consent limits for Cliff Quay STW |
14 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2013 |
15 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2014 |
16 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2014 |
17 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2014 |
18 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2012 |
19 | Eutrophication in controlled waters in the Warwickshire Avon catchment (final report). Vol 2 : appendices |
20 | Routine laboratory water sample data for the Wensum Demonstration Test Catchment's monitoring kiosk D |
21 | The evaluation of a Partech model 5100 hand-held dissolved oxygen meter (220/26/T) |
22 | ISCO automatic water sample data for the Wensum Demonstration Test Catchment's Kiosk A |
23 | Routine laboratory water sample data for the Wensum Demonstration Test Catchment's monitoring kiosk C |
24 | ISCO automatic water sample data for the Wensum Demonstration Test Catchment's Kiosk D |
25 | Routine laboratory water sample data for the Wensum Demonstration Test Catchment's monitoring kiosk M |