Skip to main content
#Title
1201Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
1202River Stort : draft catchment management plan for flood defence and the environment : May 1991
1203Catchment management plans : protecting and enhancing the water environment in an integrated manner
1204Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
1205Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1206A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1207Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales
1208Report on two electrofishing surveys carried out between July 10-25 1978 and July 9-12 1979 on the proposed Kielder Water
1209An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall
1210Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1211Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
1212Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1213The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1214Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1215Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1216NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1217Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1218The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1219The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1220Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
1221Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D
1222NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging
1223Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government
1224Proposed decision for the future regulation of disposals of radioactive waste from British Nuclear fuels plc Sellafield : supporting information
1225Evaluating the impact of groundwater abstraction on key conservation sites, final report : Yare Broads and marshes (Strumpshaw Fen)