Skip to main content
#Title
1126Lower Lee fish mortalities associated with rainfall : including the event of 7/8th September 1993
1127Integrated river corridor assessment : a pilot study of the rivers Wansbeck and North Tyne in Northumbria
1128River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region)
1129Water pollution incidents in England and Wales - 1993 : report of the National Rivers Authority
1130Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
1131River Stort : draft catchment management plan for flood defence and the environment : May 1991
1132Catchment management plans : protecting and enhancing the water environment in an integrated manner
1133Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
1134Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1135A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1136Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales
1137Report on two electrofishing surveys carried out between July 10-25 1978 and July 9-12 1979 on the proposed Kielder Water
1138Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1139Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1140The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1141Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1142Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1143Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1144The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1145Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
1146Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D
1147NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging
1148Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government
1149Proposed decision for the future regulation of disposals of radioactive waste from British Nuclear fuels plc Sellafield : supporting information
1150Development of data and information sources on Natura 2000 estuarine sites in the north west : Morecambe Bay : final report