Skip to main content
#Title
1226Integrated river corridor assessment : a pilot study of the rivers Wansbeck and North Tyne in Northumbria
1227River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region)
1228Water pollution incidents in England and Wales - 1993 : report of the National Rivers Authority
1229Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
1230River Stort : draft catchment management plan for flood defence and the environment : May 1991
1231Catchment management plans : protecting and enhancing the water environment in an integrated manner
1232Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
1233Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1234A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1235Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales
1236Report on two electrofishing surveys carried out between July 10-25 1978 and July 9-12 1979 on the proposed Kielder Water
1237An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall
1238Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1239Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
1240Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1241The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1242Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1243Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1244NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1245Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1246The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1247Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
1248Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D
1249NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging
1250Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government