1101 | Biological river quality 1995 according to the general quality (GQA) scheme [map] : scale 1 : 750 000 |
1102 | Desktop study of methods for the monitoring of particulate emissions from positively pressurised baghouses |
1103 | Lower Lee fish mortalities associated with rainfall : including the event of 7/8th September 1993 |
1104 | Integrated river corridor assessment : a pilot study of the rivers Wansbeck and North Tyne in Northumbria |
1105 | Water pollution incidents in England and Wales - 1993 : report of the National Rivers Authority |
1106 | Scope for growth and levels of contaminants in mussels from the Wash. Phase 2 |
1107 | River Stort : draft catchment management plan for flood defence and the environment : May 1991 |
1108 | Catchment management plans : protecting and enhancing the water environment in an integrated manner |
1109 | A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC |
1110 | Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales |
1111 | Report on two electrofishing surveys carried out between July 10-25 1978 and July 9-12 1979 on the proposed Kielder Water
|
1112 | Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings |
1113 | Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus |
1114 | Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A |
1115 | The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands |
1116 | Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment |
1117 | Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992 |
1118 | The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon |
1119 | Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990 |
1120 | Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D |
1121 | NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging |
1122 | Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government |
1123 | Evaluating the impact of groundwater abstraction on key conservation sites, final report : Yare Broads and marshes (Strumpshaw Fen) |
1124 | Development of data and information sources on Natura 2000 estuarine sites in the north west : Morecambe Bay : final report |
1125 | An overview of the IBP compound when building was finished (generator located in disused house in front). |