Skip to main content
#Title
26East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
27Enhancement of spring salmon- Proceedings of a one-day conference held in the Rooms of the Linnean Society of London
28An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
29Water quality objectives: procedures used by the NRA for the purpose of surface waters river ecosystem) (classification) regulations 1994
30River Habitat Quality the physical character of rivers and streams in the UK and Isle of Man
31Interim report on the environmental impacts of the drought on Yorkshire rivers April 1995 to April 1996
32Links and Interactions Between the RBMPs and Development Plans in Scotland
33The effects of fishing at low water levels
34Enhancing the environment : 20 case studies in London
35Fisheries of the middle and lower Wylye and factors affecting their performance
36Investigation of mercury contamination in the Red River catchment, West Cornwall
37Environmental planning issues in the North Wessex area
38A Review of Methods for Assessing the Hydromorphology of Lakes
39Guide to freshwater fishing in the Northern area of Anglian Region
40First annual review of the River Tone catchment management plan
41Fish Guide 1997/98 A Guide to day ticket fisheries in the Midlands
42The Blackwater River catchment management plan : first annual review 95/96 : Draft Document
43Non-compliance with water quality objectives on the Croyde stream (upper catchment)
44First annual review of the River Exe catchment management plan
45First annual review of the River Taw catchment management plan (1996)
46River water quality in the Midlands 1994/95 : water quality summary data
47The quality of rivers in England and Wales (1990 to 1995)
48An assessment of river water quality in the River Kenn
49Guidelines for river corridor surveys in the NRA : February 1992. draft 3
50The Wandle, Beverley Brook, Hogsmill catchment management plan : consultation report : November 1994