Skip to main content
#Title
1176Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
1177River Stort : draft catchment management plan for flood defence and the environment : May 1991
1178Catchment management plans : protecting and enhancing the water environment in an integrated manner
1179Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1180A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1181Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales
1182Report on two electrofishing surveys carried out between July 10-25 1978 and July 9-12 1979 on the proposed Kielder Water
1183An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall
1184Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1185Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
1186Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1187The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1188Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1189Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1190NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1191Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1192The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1193The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1194Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
1195Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D
1196NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging
1197Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government
1198Proposed decision for the future regulation of disposals of radioactive waste from British Nuclear fuels plc Sellafield : supporting information
1199Evaluating the impact of groundwater abstraction on key conservation sites, final report : Yare Broads and marshes (Strumpshaw Fen)
1200Development of data and information sources on Natura 2000 estuarine sites in the north west : Morecambe Bay : final report