Skip to main content
#Title
1201Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1202A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1203Correspondence Relating to the Seismic Surveys of Lake District Water Bodies undertaken by Prof. Gerald Sargent in 1983 and 1987
1204The Effect of N Fertiliser forms on nitrous oxide emissions from UK arable and grassland. Defra project number NT2605
1205The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Dumfries, 2004
1206The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Devon, 2004
1207Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales
1208Effects of flow regime on the young stages of salmonid fishes- summary and conclusions based on results for 1981- 1985
1209Report on two electrofishing surveys carried out between July 10-25 1978 and July 9-12 1979 on the proposed Kielder Water
1210An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall
1211Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1212Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
1213Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1214The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1215Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1216Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1217Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1218NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1219Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1220The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1221The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1222Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
1223Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D
1224NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging
1225Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government