Skip to main content
#Title
1226Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1227A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1228The Effect of N Fertiliser forms on nitrous oxide emissions from UK arable and grassland. Defra project number NT2605
1229The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Norfolk, 2004
1230The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Dumfries, 2004
1231The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Devon, 2004
1232Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales
1233Effects of flow regime on the young stages of salmonid fishes- summary and conclusions based on results for 1981- 1985
1234Report on two electrofishing surveys carried out between July 10-25 1978 and July 9-12 1979 on the proposed Kielder Water
1235Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk F in 2013
1236An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall
1237Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1238Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
1239Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1240Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2014
1241Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2012
1242The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1243Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1244Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1245Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1246NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1247Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1248Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013
1249The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1250Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990