Skip to main content
#Title
1076The Wandle, Beverley Brook, Hogsmill catchment management plan : consultation report summary : November 1994
1077The distribution of PCDDS and PCDFS in surface freshwater systems 2nd Interim Progress Report - February 1993
1078A study to investigate and propose remedies for river quality problems in the Madford catchment
1079East Devon public water supply strategy : preliminary assessment of the yield of Clatworthy reservoir
1080River corridor strategic overview feasibility study : a report to the National Rivers Authority
1081Regional river quality monitoring and surveillance : results of the 1990/1991 biological survey : draft report
1082R and D Strategy to Support Implementation of the Water Framework Directive - Preliminary Scoping Report
1083Land drainage consent report : investigation of the conservation input into land drainage consents
1084Electron Microscope Image: Filament of Oscillatoria being ingested by the ciliate Nassula tumida
1085The government's policy for a public regulatory body in a privatised water industry
1086The evaluation of a LTH BOM 1 hand-held dissolved oxygen meter (220/25/T)
1087Less sensitive areas and candidate high natural dispersion areas in the North West region
1088Water pollution incidents in England and Wales - 1990 : report of the National Rivers Authority
1089Interpretation Of Optimisation In The Context Of A Disposal Facility For Long-Lived Radioactive Waste
1090Two year aesthetic survey of beaches in the South West (1990 and 1991)
1091The Impact of Pesticides on River Ecology: Phase 2: A study of headwater streams
1092The Influence of Variations in Flow on General Quality Assessment of Rivers - Summary Document
1093An Investigation of the Equivalent Resistance, Power Requirements and Field Characteristics of Electric Fishing Electrodes
1094Annual classification of river water quality 1992 : numbers of samples exceeding the quality standard
1095The Chemistry of Blended Cements and Backfills Intended for use in Radioactive Waste Disposal
1096Darwell Transfer Scheme. Final Report Part III. Water quality in the Darwell Reservoir
1097Water pollution incidents in England and Wales 1991 : report of the National Rivers Authority
1098The Impact Of Grazing And Upland Management On Erosion And Runoff: Additional Information
1099Extending Rutland yield analysis to 1933 : supporting documentation for the regional water resources strategy
1100A report into the impact of small dam construction at Delford bridge, De Lank river