Skip to main content
#Title
826Old Bedford incorporating the Middle Level and Ouse Washes : second annual review : July 2000
827Scenarios for the operational implementation of remote sensing of snow by satellites : interim report (207/3/N)
828Macrophyte status of the Rivers Test and Itchen - Hampshire : summary report - October 1998
829The application and validation of in situ ecotoxicological assays at biologically and chemically incongruous sites (379/2/T)
830A report on a baseline survey of the subtidal benthic communities within Portland Harbour (January 1997)
831Policy and practice for the protection of groundwater : regional appendix South West region
832The available resource methodology : a framework for assessing water resources and abstraction availability : final report
833An environmental assessment of mercury in mussels (Mytilus edulis L.) in the Mersey Estuary : final report
834A review of the industrial uses of continuous monitoring systems : minerals industry processes
835Herbicides for use in or near the aquatic environment: Priorities for Environmental Quality Standards Development
836Manual for the use of herbicides in or near water : April 1993 : final draft report
837Direct toxicity assessment : a step towards better environmental protection within the UK : business strategy
838Pesticides 2000 : a summary of monitoring of the aquatic environment in England and Wales
839Analysis of airborne platform specifications and operations for the National Rivers Authority by Atlantique Reconnaissance Ltd
840Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996
841The evaluation of a pHOX model 962 hand-held dissolved oxygen meter (220/28/T)
842The evaluation of a WTW model OXI 196 hand-held dissolved oxygen meter (220/29/T)
843The evaluation of a YSI model 58 hand-held dissolved oxygen meter (220/24/T)
844The evaluation of an ABB Kent-Taylor model 7135 hand-held dissolved oxygen meter (220/30/T)
845An evaluation of discharge and consent compliance policy : a blueprint for the future
846An evaluation of discharge and consent compliance policy : a blueprint for the future : letters from respondents
847Definition of terms used in the assessment information management system (AIMS) : guidance note 5
848The Natural (Baseline) Quality of Groundwaters in England and Wales - Magnesium Limestone of Yorkshire and Northumbria
849Analysis of bacteriological contamination and accumulation of metals and organics in the mussel (Mytilus edulis)
850Desktop study of methods for the monitoring of particulate emissions from positively pressurised baghouses