Skip to main content
#Title
1326The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Devon, 2004
1327Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales
1328Analysis of natural and polluted river communities in Great Britain- Progress report for the period April 1984- March 1988
1329Effects of flow regime on the young stages of salmonid fishes- summary and conclusions based on results for 1981- 1985
1330Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk F in 2013
1331An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall
1332Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1333Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
1334Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1335Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2014
1336Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2012
1337The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1338Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1339Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1340Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1341NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1342Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1343The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1344Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013
1345The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1346Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
1347Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D
1348NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging
1349Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government
1350Proposed decision for the future regulation of disposals of radioactive waste from British Nuclear fuels plc Sellafield : supporting information