Skip to main content
#Title
26Macroinvertebrates of the River Nar : Great Ouse catchment : draft report
27Survey of copper speciation in the Great Ouse estuary
28'Sea Vigil' water quality monitoring : the East Anglian coast 1994
29Investigation of salinity in the river Thurne catchment of North East Norfolk
30Habitat preferences of the bullhead (Cottus gobio) in some Norfolk rivers
31'Sea Vigil' water quality monitoring : the East coast 1992-1993
32Wash zone report. Part 1 : the Wash NRA monitoring review
33'Sea Vigil' water quality monitoring : the Wash 1992-1993
34Broadland flood alleviation strategy : the programme for flood defence works
35The mobilization and release of mercury, copper, iron, manganese and selenium from contaminated sediment as a result of dredging : laboratory simulation studies : interim report to the National Rivers Authority Anglian Region
36Recorded rainfall data in the Wensum Catchment between 2010 and 2015 (hourly resolution)
37YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2013
38YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2014
39YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2014
40YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2014
41Routine laboratory water sample data for the Wensum Demonstration Test Catchment's monitoring kiosk B
42YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2012
43Routine laboratory water sample data for the Wensum Demonstration Test Catchment's monitoring kiosk D
44Broadland flood alleviation strategy : bank strengthening and erosion protection : the programme for flood defence work
45ISCO automatic water sample data for the Wensum Demonstration Test Catchment's Kiosk C
46YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk D in 2011
47YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2012
48Linking hydrology and ecology : River Wissey : Annex B aquatic macrophytes of the River Wissey
49Effectiveness of eutrophication control by phosphorus reduction: development of the INCA-P model
50The River Babingley. Volume 1 : executive summary : a report for National Rivers Authority, Anglian Region