Skip to main content
#Title
926Artificial recharge to groundwater in the Otter valley
927The Ely Ouse catchment management plan : final plan : January 1994
928Investigating the Applicability of Passive Sampling Devices to Pesticide Monitoring
929State of the environment report for Thames Region : first update 2001
930State of the environment report 2001 : West Midlands Region
931Groundwater flooding in the Thames region : winter 2000/01
932The environmental requirements of adult Atlantic salmon (Salmo salar L.) during their upstream migration in the Northwest Miramichi River, New Brunswick. Draft.
933Hams Hall Power Station. A survey of the flora and fauna of freshwater habitats in the environs of Hams Hall Power Station, Birmingham
934Interim review of drought management experience in the North West Region of the National Rivers Authority. lessons learned (29th June 1995 - March 31st 1996)
935Water company plans to safeguard 1997 summer water supplies : Environment Agency report to the Secretary of State for the Environment : fifth report in a series
936Catch and release: the survival and behaviour of Atlantic salmon angled and returned to the Aberdeenshire Dee, in spring and early summer
937Spring salmon : a review of factors affecting the abundance and catch of spring salmon from the River Wye and elsewhere, and proposals for stock maintenance and enhancement
938Water Quality and Freshwater Flow in the Thames Tideway in Relation to Salmon Migration, with particular reference to the effects of low flow in 1990
939Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary
940The quality of rivers and canals in England and Wales (1990 to 1992) : as assessed by a new general quality assessment scheme : report of the National Rivers Authority
941Tamar Lakes project 2001 : initial assessment of nutrient data to identify pollution sources, assess the effect of Tamar Lakes on the downstream water quality and to recommend future monitoring requirements
942Local environment focus : issues in and around Derby, Matlock, Buxton, Bakewell, Belper and the Derbyshire Dales Issue 3 : Environment Agency Newsletter for the Derbyshire Derwent Catchment October 2003
943Time of travel on the River Lee under high and medium flow : appendix b : time of travel on the small River Lee
944Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989
945Implications of draft EC Directive concerning municipal waste water treatment : Memorandum submitted by the NRA to House of Lords Select Committee on the European Communities
946The mobilization and release of mercury, copper, iron, manganese and selenium from contaminated sediment as a result of dredging : laboratory simulation studies : interim report to the National Rivers Authority Anglian Region
947Use of rod catch-effort data to monitor migratory salmonids in Wales : a report submitted in part fulfillment of the requirements of the course
948Report for Anglian Water, plc on the use of the Orwell Estuary mathematical model to derive long term consent limits for Cliff Quay STW
949Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998
950Technical review of the post-closure safety case for the Drigg low-level radioactive waste disposal site : PCSC development programme review plan and instructions for reviewers : guidance note 1, December 1997